Built from the ground up

During this 18 month project, the team at Smartweld designed the building and manufactured the steelwork inhouse including erecting the portals on site. After the building was finished we still had to fit out the building with airlines, PA doors & cable trays for electrical. This was a mammoth task because we still needed to keep up with normal manufacturing out of the old site at the same time. In the end we now have a very functional work space and site layout that allows good production flow.

We are also still very close to the city to service our customers as normal.

I would like to thank the following suppliers & contractors, that were an integral part of the whole process.

  • TM Consultants
  • The Roofing Store
  • PA Phillips Electrical
  • Justin Mckenzie Drainage Ltd
  • Keats Creations
  • Brownlees Contracting
  • Canterbury Water Services
  • Elite Plumbing Ch-Ch Ltd
  • Vulcan Steel
  • Dimond Roofing